Office: (506) 473-7078
Cell: (506) 473-0155
info@glineconstruction.com
10551 Route 144,
Saint-André, NB E3Y 3H9
Dates: May 2019 - September 2019
Location: Anagance, NB
Status: Complete
As part of a new 20MW wind energy project, Gagnon Line Construction was hired to construct 5.3 km of new 69kV Transmission line to connect the owner substation to the local utility grid. The transmission was primarily H-Frame construction which consisted of 32 structure builds including one 69kV gang switch. The project poised various challenges and obstacles including strnging beneath a 345kV, 138kV, and 69kV existing electrical corridor as well as crossing over the meandering Kennebacasis River.
We are capable of building and maintaining your distribution network from the ground up.
We have a team of skilled linemen and groundmen ready to handle the intricate task.
We offer a full range of machines, tools, equipment and supplies to meet all of your job site needs.
Gagnon Construction provides high quality aggregates which results in durability and performance.
24/7 coverage for
trouble calls