L1245 and L1110 Structure Replacements

Dates: October 2017 - March 2018

Location: Saint-Andre to Campbellton, NB

Status: Complete

Gagnon Custruction underwent a two-part transmission line project in Northern New Brunswick. Part one consists of constructing approximately 5.4km of new 138 kV transmission line to supply the rural community of Kedgwick through a newly constructed substation. The scope of the new build consists of clearing a 30m wide right-of-way 5.4km in length, installing a 32 wood pole H-Frame structures, stringing three phases of conductor as well as two lines of overhead ground wire. In addition, Gagnon constructed and installed two six pole switch structures with commissioned switches to allow the isolation of the new line.

 

 

 

Part two of the project consists of upgrading an existing steel lattice tower transmission line built in the early 1930's to remediate conductor clearance violations. Part two is composed of fourteen structures replacements and installations of six mid-span structures. Tower replacement involves installing new frame wood structures between existing phases, framing the structures, transferring the overhead grounds, conductors, and dismantling the steel towers according to the project specific work methods developed by Gagnon Construction management personnel. Mid-span structure installation, framing, OHGW, conductor shortening and splicing, as well as attachment to the new structures. Part two was completed in three separate de-energization outage and spans a distance of approximately 140km in Northern New Brunswick.

 

 

 

Clients say

The Juno nor'easter is behind us and I think we can all agree on one thing: it pays to be prepared. Based on the weather forecasts as well as our experience, we prepared for a multi-da...

John Bruckner
Read all

our services

  • Power Line Construction & Maintenance

    We are capable of building and maintaining your distribution network from the ground up.

    Learn more
  • Storm
    Restoration

    We have a team of skilled linemen and groundmen ready to handle the intricate task.

    Learn more
  • Equipment
    Rentals

    We offer a full range of machines, tools, equipment and supplies to meet all of your job site needs. 

    Learn more
  • quarry

    Gagnon Construction provides high quality aggregates which results in durability and performance.

    Learn more

24/7 coverage for
trouble calls

Contact us