Office: (506) 473-7078
Cell: (506) 473-0155
info@glineconstruction.com
10551 Route 144,
Saint-André, NB E3Y 3H9
In 2014, Gagnon Line Construction built 55 miles of three phase distribution lines to supply power to 11 sugarbush and 13 pumping stations situated in the North Western area of New Brunswick, Canada. Gagnon Line Construction was responsible for the engineering and construction of the 25 KV distribution network, installation of transformers and electrical connections to the customers. This project was a huge success for both the maple syrup co-op and Gagnon Line Construction.
Take a look below at our equipment in action and the final result:
We are capable of building and maintaining your distribution network from the ground up.
We have a team of skilled linemen and groundmen ready to handle the intricate task.
We offer a full range of machines, tools, equipment and supplies to meet all of your job site needs.
Gagnon Construction provides high quality aggregates which results in durability and performance.
24/7 coverage for
trouble calls